Gas Line Digging
At 8am this morning I was startled to hear a loud hissing of air. The wellhead is now looking like something I would have made with my 'tinker toys' back in 1963. They are also digging to install the gas line to East Ohio Gas. The yellow line is to East Ohio's specs of 60 lbs. The pipe at the wellhead will have a pressure test to 250 lbs.


0 Comments:
Post a Comment
Subscribe to Post Comments [Atom]
Links to this post:
Create a Link
<< Home