Pastor Kozak
Veritas Odium Parit
Click here to get your own player.
Wednesday, November 23, 2005

Nov. 21, 2005. The shell of the elevator is now in the shaft. The tall silver box outside the shaft is the electronic 'brain' of the system. A carpenter was here today filling in the gaps between the shaft cinderblocks and the church floor. He also removed the front of the safety wall that's been covering the shaft for the past 2 months. A wooden railing made of 2x4s will be used now.
Saturday, November 19, 2005
Tuesday, November 15, 2005

15 Nov 05 Here is the view taken from the balcony looking down into the shaft. You can see the platform in the basement, Also note the opening at the lower narthex level toward the top of the picture. There is no work going on today, Tuesday the 15th of November. They got a call to work at the Akron/Canton airport.
















